Service
Tub-to-Shower Conversion in Roanoke, VA
Replace an unused tub with a walk-in shower, most common single-day-quote job in Roanoke.
Tub-to-shower conversion is the specific subset of shower conversion where the old alcove tub comes out and a walk-in tile shower goes in the same footprint. It is one of the most common bathroom updates in older Roanoke homes, 1940s, 1950s, and 1960s builds where the original 60-inch alcove tub is still installed but no one in the household uses it. Cost typically lands at $8,500 to $14,000 for a straight swap with mid-grade tile and a standard glass panel. Timeline runs 8 to 12 working days.
What is included
- Old tub demo and disposal, cast-iron included
- Substrate inspection, most 1940s-1960s Roanoke homes need some subfloor and framing work under the old tub
- Waterproofing per manufacturer spec
- Tile installation with proper slope and drain
- Modern shower valve, trim finishes matched to the rest of the bath
- Frameless or semi-frameless glass panel installation
- Two-year workmanship warranty
Common questions about tub-to-shower
Will removing the tub hurt my Roanoke home resale value?
How much does tub-to-shower conversion cost in Roanoke?
How long does the conversion take?
What happens to the old cast-iron tub?
Can you keep the existing plumbing to save money?
Related Reading
More on tub-to-shower in the Roanoke Valley
Curbless Shower Conversion in a Roanoke Home: What It Takes
The specific structural and design considerations for converting a standard bathroom to a curbless (zero-entry) walk-in shower. Aging-in-place, contemporary design, and older-home constraints.
Schluter Kerdi vs RedGard vs Kerdi-Board: Which Shower Waterproofing Is Right?
The three legitimate residential shower waterproofing systems compared, Schluter Kerdi sheet membrane, RedGard liquid membrane, and Kerdi-Board integrated substrate. When each fits.
Other Services
Consider these adjacent scopes
Bathrooms sometimes benefit from combined scope. If you are already remodeling one bathroom, adding a second under the same permit and crew usually saves 15 to 25 percent versus separate projects.
Full Bathroom Remodel
Complete bathroom renovation from demo through final punch list, typical 3 to 5 week timeline
Walk-In Shower Conversion
Convert an old tub or dated shower into a modern walk-in with proper waterproofing
Small Bathroom & Powder Room Remodel
Half-bath, powder room, and small hall-bath remodels, tight footprint, big impact
Primary Bathroom Remodel
Primary suite bathroom builds, separate walk-in shower, double vanity, spa-scale scope
Ready to plan your bathroom remodel?
Tell us about the project and get one call back from a trusted local remodeler with a free written quote. No obligation, no call list.